M3 Bathroom Renovation Project 2

Maria and Phil wanted to create a bigger shower and still have the bathtub but did not know if it was possible.

M3 Renovations came in and presented two design options for their bathroom. In the process many other damages were discover but our team of experts took take of it and deliver the best quality craftsmanship possible.

  • Tear out old shower and tub
  • Modify the plumbing to fit in the new shower
  • Carefully repaired the floor and exterior wall damages
  • Install new acrylic shower base and tub
  • Install new lighting
  • Tiled
  • Custom glass shower enclosure
  • Painted

Customer was very happy and satisfied with the work and ask to do theirs sons bathroom right after.